| Commitment/Mitigation Tasks | When to Occur* | Status | Date Completed | Links to Relevant Resources |
 |
| Joint Use Development Plan will be implemented | P,F | No Activity | N/A | Joint Use Development Plan |
 |
| Vehicular and pedestrian access will be provided across the I-49 Connector | P,F | Ongoing | N/A | Access and Circulation / CSS |
 |
| The elevation of the roadway structure will be increased above the minimum requirement | P,F | Vertical clearance for design will be 2'-3' higher than minimum. | N/A | N/A |
 |
| Post construction tree survey and damage assessment | C | No Activity | N/A | N/A |
 |
| *Note: P = Preliminary Design Phase, F = Final Design Phase, C = Construction Phase |