images:environmental mitigation:wetlands IMPACT:

Impacts to the water quality of the Vermilion River associated with the proposed project would be similar for all alternatives considered in the Final EIS including the Selected Alternative.
image:decorative
It is not expected that impacts of the proposed project would be noticeably greater than impacts currently attributable to the existing Thruway.

COMMITMENT:

Design of the river crossing will be conducted so as to not restrict the flow of the Vermilion River for the 100 year flood.

Temporary erosion control procedures to control sediment-laden runoff from unstable construction embankments will be employed to minimize impacts to the Vermilion River during the construction phase of the project.

STATUS:

See table below.


VERMILION RIVER
Commitment/Mitigation TasksWhen to Occur*StatusDate CompletedLinks to Relevant Resources
image:spacer
Hydraulic studies and bridge design details for 100 year floodP,FPreliminary bridge design using 100 year flood elevation.N/AN/A
image:spacer
Temporary erosion control proceduresF,CNo ActivityN/AN/A
image:spacer
*Note: P = Preliminary Design Phase, F = Final Design Phase, C = Construction Phase
image:spacer
image:spacer
image:right arrow Displacements
image:spacer
image:right arrow Archaeological
image:spacer
image:right arrow Historic District
image:spacer
image:right arrow Historic Properties
image:spacer
image:right arrow Noise
image:spacer
image:right arrow Air Quality
image:spacer
image:right arrow Waste Sites
image:spacer
image:right arrow Water Quality
image:spacer
image:right arrow Chicot Aquifer
image:spacer
image:right arrow Lafayette Airport
image:spacer
image:right arrow Wetlands
image:spacer
image:right arrow Vermilion River
image:spacer
image:right arrow Parks
image:spacer
image:right arrow Live Oak Trees
image:spacer
image:right arrow Construction Debris
image:spacer
image:right arrow Signing & Traffic Control
image:spacer
image:right arrow Access & Circulation
image:spacer
image:right arrow Community Cohesion
image:spacer
image:right arrow Corridor Preservation
image:spacer
image:right arrow Facility Construction
image:spacer
image:right arrow Joint Use Development
image:spacer
image:right arrow Monitoring & Reporting
image:spacer
image:spacer image:spacer