| Commitment/Mitigation Tasks | When to Occur* | Status | Date Completed | Links to Relevant Resources |
 |
| Hydraulic studies and bridge design details for 100 year flood | P,F | Preliminary bridge design using 100 year flood elevation. | N/A | N/A |
 |
| Temporary erosion control procedures | F,C | No Activity | N/A | N/A |
 |
| *Note: P = Preliminary Design Phase, F = Final Design Phase, C = Construction Phase |